Schubag
Jump to navigation
Jump to search
This page documents the schubag extended baggage.
First, here is drawing showing the tube placement. It shows T7 tube in a dogleg instead of the T5 tube in a V. The right side tube is 12" at a 45* angle and other tubes are fitted to meet with it.
Here is a picture of the actual tube in place. It shows the fairleads tacked in first, then the tubes installed under them.
Once the tubing was in place I mailed Bob Barrows asking about re-routing the elevator cable. Here is what I sent him: Extended_baggage_changes.pdf
Here is what he wrote back: Barrows_reply.pdf
Here is the drawing for the new elevator bracket: Elevator_bracket.dxf
