Difference between revisions of "Order of building"
Jump to navigation
Jump to search
(Created page with "Firewall forward: # Look at fuel lines, oil cooler, oil cooler lines, cables, heater box, scat tube and determine locations for everything. # Mount oil cooler. # Run oil cool...") |
|||
| Line 1: | Line 1: | ||
| − | Firewall forward: | + | Firewall forward (once we have the oil cooler back): |
# Look at fuel lines, oil cooler, oil cooler lines, cables, heater box, scat tube and determine locations for everything. | # Look at fuel lines, oil cooler, oil cooler lines, cables, heater box, scat tube and determine locations for everything. | ||
| Line 14: | Line 14: | ||
# Make cowl flaps | # Make cowl flaps | ||
| − | Doors and panels | + | Doors and panels: |
# Make window edging (.025). | # Make window edging (.025). | ||
# Make upper guide mount (.025). | # Make upper guide mount (.025). | ||
# Fit the fuel lines. | # Fit the fuel lines. | ||
| − | # Groom interior wiring. | + | # Groom interior wiring to trim controller. |
| + | # Lay out rear headset wiring. | ||
| + | # Lay out ELT wiring. | ||
# Wire antennas for ADS-b in/out. | # Wire antennas for ADS-b in/out. | ||
# Fit the kick panels and make sure they lay nice. | # Fit the kick panels and make sure they lay nice. | ||
| Line 42: | Line 44: | ||
# Wire trim controller. | # Wire trim controller. | ||
# Wire ap cancel, PTT, trim functions. | # Wire ap cancel, PTT, trim functions. | ||
| + | # Wire beacon light. | ||
Revision as of 16:09, 19 May 2024
Firewall forward (once we have the oil cooler back):
- Look at fuel lines, oil cooler, oil cooler lines, cables, heater box, scat tube and determine locations for everything.
- Mount oil cooler.
- Run oil cooler lines.
- Run fuel lines.
- Install cable passthrough and measure out cable lengths.
- Order control cables.
- Wire oil pressure, oil temp, fuel temp, fuel pressure, fuel flow.
- Install control cables except cowl flap.
- Build lower exhaust mounts.
- Sort out nosebowl.
- Make cowling and trim baffling.
- Make cowl flaps
Doors and panels:
- Make window edging (.025).
- Make upper guide mount (.025).
- Fit the fuel lines.
- Groom interior wiring to trim controller.
- Lay out rear headset wiring.
- Lay out ELT wiring.
- Wire antennas for ADS-b in/out.
- Fit the kick panels and make sure they lay nice.
- Make a bath.
- Alodine kick panels, window edging, window guide mount, tail rock cover, tail inspection panel covers, door skins, boot cowl, belly inspection panel, belly skins, rear bulkhead.
- Paint kick panels, window edging, window guide mount, tail rock cover, tail inspection panel covers, door skins, boot cowl, belly inspection panel, belly skins.
Rudder:
- Inspect.
- Fabric wash.
- Primer.
- Sand, inspect.
- Paint grey. If door skins, boot cowl, and rear bulkhead are done, paint those too.
Interior:
- Install head liner (unless ELT wiring isn't complete).
- Finish seat pans.
- Make Flap handle floor cover.
- Install stick.
- Wire trim controller.
- Wire ap cancel, PTT, trim functions.
- Wire beacon light.