Difference between revisions of "Order of building"
Jump to navigation
Jump to search
| Line 5: | Line 5: | ||
# <s>Run oil cooler lines.</s> | # <s>Run oil cooler lines.</s> | ||
# Run fuel lines through doors. | # Run fuel lines through doors. | ||
| − | # Make vapor return line between bulkhead and fuel selector | + | # <s>Make vapor return line between bulkhead and fuel selector</s> |
# Mount heater muff | # Mount heater muff | ||
# Install cable passthrough and measure out cable lengths. | # Install cable passthrough and measure out cable lengths. | ||
| Line 18: | Line 18: | ||
Doors and panels: | Doors and panels: | ||
| − | # Make window edging (.025). | + | # <s>Make window edging (.025).</s> |
| − | # Make upper guide mount (.025). | + | # <s>Make upper guide mount (.025).</s> |
| − | # Fit the fuel lines. | + | # <s>Fit the fuel lines.</s> |
# Groom interior wiring to trim controller. | # Groom interior wiring to trim controller. | ||
# Lay out rear headset wiring. | # Lay out rear headset wiring. | ||
Revision as of 17:09, 19 June 2024
Firewall forward (once we have the oil cooler back):
Look at fuel lines, oil cooler, oil cooler lines, cables, heater box, scat tube and determine locations for everything.Mount oil cooler.Run oil cooler lines.- Run fuel lines through doors.
Make vapor return line between bulkhead and fuel selector- Mount heater muff
- Install cable passthrough and measure out cable lengths.
- Order control cables.
- Wire oil pressure, oil temp, fuel temp, fuel pressure, fuel flow.
- Install control cables except cowl flap.
- Build lower exhaust mounts.
- Sort out nosebowl.
- Make cowling and trim baffling.
- Make cowl flaps
Doors and panels:
Make window edging (.025).Make upper guide mount (.025).Fit the fuel lines.- Groom interior wiring to trim controller.
- Lay out rear headset wiring.
- Lay out ELT wiring.
- Wire antennas for ADS-b in/out.
- Fit the kick panels and make sure they lay nice.
- Make a bath.
- Alodine kick panels, window edging, window guide mount, tail rock cover, tail inspection panel covers, door skins, boot cowl, belly inspection panel, belly skins, rear bulkhead.
- Paint kick panels, window edging, window guide mount, tail rock cover, tail inspection panel covers, door skins, boot cowl, belly inspection panel, belly skins.
Rudder:
- Inspect.
- Fabric wash.
- Primer.
- Sand, inspect.
- Paint grey. If door skins, boot cowl, and rear bulkhead are done, paint those too.
Interior:
- Install head liner (unless ELT wiring isn't complete).
- Finish seat pans.
- Make Flap handle floor cover.
- Install stick.
- Wire trim controller.
- Wire ap cancel, PTT, trim functions.
- Wire beacon light.