Difference between revisions of "Order of building"
Jump to navigation
Jump to search
| Line 1: | Line 1: | ||
Firewall forward (once we have the oil cooler back): | Firewall forward (once we have the oil cooler back): | ||
| − | # Look at fuel lines, oil cooler, oil cooler lines, cables, heater box, scat tube and determine locations for everything. | + | # <s>Look at fuel lines, oil cooler, oil cooler lines, cables, heater box, scat tube and determine locations for everything.</s> |
| − | # Mount oil cooler. | + | # <s>Mount oil cooler.</s> |
| − | # Run oil cooler lines. | + | # <s>Run oil cooler lines.</s> |
| − | # Run fuel lines. | + | # Run fuel lines through doors. |
| + | # Make vapor return line between bulkhead and fuel selector | ||
| + | # Mount heater muff | ||
# Install cable passthrough and measure out cable lengths. | # Install cable passthrough and measure out cable lengths. | ||
# Order control cables. | # Order control cables. | ||
Revision as of 10:09, 29 May 2024
Firewall forward (once we have the oil cooler back):
Look at fuel lines, oil cooler, oil cooler lines, cables, heater box, scat tube and determine locations for everything.Mount oil cooler.Run oil cooler lines.- Run fuel lines through doors.
- Make vapor return line between bulkhead and fuel selector
- Mount heater muff
- Install cable passthrough and measure out cable lengths.
- Order control cables.
- Wire oil pressure, oil temp, fuel temp, fuel pressure, fuel flow.
- Install control cables except cowl flap.
- Build lower exhaust mounts.
- Sort out nosebowl.
- Make cowling and trim baffling.
- Make cowl flaps
Doors and panels:
- Make window edging (.025).
- Make upper guide mount (.025).
- Fit the fuel lines.
- Groom interior wiring to trim controller.
- Lay out rear headset wiring.
- Lay out ELT wiring.
- Wire antennas for ADS-b in/out.
- Fit the kick panels and make sure they lay nice.
- Make a bath.
- Alodine kick panels, window edging, window guide mount, tail rock cover, tail inspection panel covers, door skins, boot cowl, belly inspection panel, belly skins, rear bulkhead.
- Paint kick panels, window edging, window guide mount, tail rock cover, tail inspection panel covers, door skins, boot cowl, belly inspection panel, belly skins.
Rudder:
- Inspect.
- Fabric wash.
- Primer.
- Sand, inspect.
- Paint grey. If door skins, boot cowl, and rear bulkhead are done, paint those too.
Interior:
- Install head liner (unless ELT wiring isn't complete).
- Finish seat pans.
- Make Flap handle floor cover.
- Install stick.
- Wire trim controller.
- Wire ap cancel, PTT, trim functions.
- Wire beacon light.